IEC Supply, LLC - Automation and Control Specialists

Value Added Services

Wireless Path / Radio Site Surveys
The foundation of a reliable radio network is the RF Site Survey. The Customer Support engineer performs on-site measurements and analysis to determine factors needed to design the RF data communications system including RF signal levels between all nodes, co-channel emitter frequencies, their signal strengths, and RF data quality. Additional design input is given on antenna selection and location, feedline requirements, and lightning/power protection for sitesurvey.jpg (1788 bytes)
each node, as well as specific installation requirements as dictated by the customer's application. After completion of the analysis, a formal Site Survey Report is prepared to document the above findings and the installation/hardware requirements for the site.
Custom Terminal/Wire Markers & Labeling
IEC Supply offers Custom Label Printing. Phoenix Contact, Allen Bradley or Weidmuller compatible. No minimum or maximum quantity restrictions, no waiting for long factory deliveries or extra shipping costs. Free custom design software - CLIP PROJECT advanced. Order your custom wire markers by 10:00 am and pick up by 2:00 pm. (Subject to blank marker availability) custom_markers.jpg (13718 bytes)
Contact any inside sales representative for price and availability.
Cut-to-length DIN Rail
IEC Supply offers Custom Cut Din Rail with no cutting fees! How does this benefit you?
Cut lengths to your specifications, no minimum or maximum cut din rail quantities, no cutting fees, no outrageous in-bound freight charges. Save on YOUR time and YOUR labor.
dinrail.jpg (2170 bytes)
Contact any inside sales representative for price and availability.
Variable Speed Drive Startup
Proper start up sequence of your VFD will impact many elements of your total operation.
IEC Supply wants to help you be sure this is a productive experience. IEC Supply offers
VFD start up service done by our own on site factory trained technician. This service not only provides factory approved start up practices it may also extend the drive warranty by one (1) full year from date of installation. Call our sales department for a quotation and get your drive in the start up schedule now.
drivestartup.jpg (14440 bytes)
Arc Flash Study
Customers perform Arc Flash Studies because:
NFPA-70E rules require Arc Flash Labels on electrical equipment.
OSHA enforces the rules in the 2009 NFPA-70E. Your plant needs to become compliant!
Call IEC Supply and find out how cost effective it is to become ARC FLASH compliant while educating and training employees on safety.
)
Home  Contact Us  Site Map